333. The following work, when carried out by the minister responsible for the Act respecting roads (chapter V-9), is eligible for a declaration of compliance:(1) concerning a single-span bridge in the littoral zone,(a) the construction when there is no flood zone;
(b) the dismantling;
(2) the construction of a culvert other than a culvert referred to in section 327, except if the work increases by more than 25% the surface area of the road or related infrastructures exposed to flooding;
(3) the construction of a temporary supporting bank.
For the purposes of this section, up to 2 weirs to allow the free circulation of fish are deemed to form an integral part of a culvert if they are located downstream from the culvert within a distance corresponding to 4 times the culvert opening.
871-2020O.C. 871-2020, s. 333; 1596-2021O.C. 1596-2021, s. 711.